Showing posts with label floor. Show all posts
Showing posts with label floor. Show all posts

Friday, 16 November 2018

An Ending is Always a New Beginning

Well, it's been a strange few months as we try to adjust to no longer having Rob's Mom in our lives. As our dear friend Elizabeth says, it's like our world has shifted and a spark has gone out. The act of grieving is such an odd and complicated process; and so completely different for Rob and I on any given day. There are times when all we want to do is sit and ponder, and other times we want to run away.  Some days we figure if we just keep busy enough we can keep our thoughts at bay. There are days when we are sad, and days when we spend time reminiscing about the past. Regardless, we understand that this is a part of life, and it is a process. We have learned over time, to mostly let the days unfold as they will, at least as much as we can. And we are always entirely grateful for every bit of time that Mom was here in our lives. We sure do miss her though.

We made plans to hold a small ceremony here for her in late August. Not everyone was able to attend the Celebration of Life that was held in St. Catharines in May, so we thought it would be nice to invite those who couldn't make it, to come here. And it seemed like the right way to honour her connection to this beautiful area and the cabin that she loved so much. With some family members arriving and needing a place to stay, and others coming for the ceremony and a luncheon, Rob and I got just the motivation we needed to get back to working on the new house, and to spend some time figuring out some of the meals and logistics for the upcoming event.  I kept referring to it as "Mom's party", as we wanted the event to be a celebration.

Although Rob and I hadn't yet stayed in the new house, we knew that we could make it comfortable enough for his two brothers and a sister-in-law to stay there.  We told them it would be a bit like "glamping" (glamorous camping) but it was really much better than that.  Well, at least we hoped it would be by the time they arrived ! First Rob had to get back to working on the guest bathroom; putting in a sink and counter.  He made the counter out of maple, in a butcher block style, and installed a sink that we had bought second hand from a friend when he was renovating his bathroom some years earlier.  But the real coup was the sink tap, a perfectly good Moen tap that I had scooped for free at a nearby Reuse center.  (A place where you can drop off no-longer needed  household items, or pick up what has been dropped off - all for free. Not only is it a great way to divert items from landfill, but it was free! ) Oops, I  had already mentioned the "free" part. Anyone who knows me though, knows how much I appreciate something for nothing! A little bit of a clean up and the tap worked perfectly, and it looks great too.


Next on the "to-do" list was to empty out the master bedroom, which was full of tools, scaffolding, and tiles, not to mention the bathtub for the master bathroom.  So it was obviously time to get that tub installed.  In our drawing plans this tub has moved location several times. We have gone back and forth on whether to place it along the wall that is positioned under the window, or the wall to the left of it.  I'm pretty sure it's final resting place is likely where it was first drawn in the original plans!


We installed cement board around the tub frame, and prepared the wall for the tiles.  But we soon discovered the wall wasn't completely flat, (one of the wood studs had bowed and pushed the drywall out) so we had to cut out a piece of drywall, trim the stud and start over. If we had been using smaller tiles we probably would have been o.k., but with the large tiles we chose, it was more critical to have a flat surface to mount them on. On the plus side, this gave us a chance to do some additional work from the mudroom side (after cutting out a bit of drywall on the other side of the wall).  It sometimes seems like we do a lot of the proverbial "two steps forward, one step back" dance, but that seems to be a part of the building process.


Next up was the tiling job. It's hard on the knees, (notice I didn't say "old" knees !) so we are thankful for knee pads.  We puzzled over the best way to finish the area where the horizontal surface tiles around the bath met the vertical surface tiles at the side of the bath.  Eventually we found a great rounded corner bead product. Of course this involved multiple trips to hardware stores and tile stores before we found the right one. Then we balked at the price, but in the end, couldn't find anything else that would do it as neatly so went for it.  Although we had to order it, it fortunately arrived within a week or so.


Grouting was the next item on the list.  We really couldn't be sure that we had picked the right colour of grout until it was all applied and had time to dry.  We'd been looking at grout colour charts for quite a while, and my original choice was a somewhat lighter shade, but I'm glad we went with the darker one.  I had no idea there were even so many choices in grout colours until now. I'm guessing the last time we grouted around bathroom tiles there was no real choice!

I did a double take when I saw the photo below, as it looks like an Obi Wan Kenobi light sabre beaming in . On closer look, it's just the light coming in through the window. Still, it looks kind of cool!



Rob checks out the new taps!  There was a lot of discussion on tap placement, but in the end, there was only one choice. Funny how that works out.  The drain for this tub is in the center which seems unusual to me, but then I'm used to a pretty standard old fashioned tub.


Before I knew it, the walls were primed, painted, and the bathtub was permanently installed.  I swore I wasn't going to test out this tub until we actually moved in. But one day in September we had a day long power outage at the cabin, and had no running water there. Of course the new house, being solar powered, had plenty of running water! As we had plans to go out to a movie, and wanted to get cleaned up first, we agreed we would use the new tub that day.  Ahhhh...it is a very comfortable bathtub for sure. We need to install some grab bars though as it is a pretty deep tub, and they would be useful to hold onto when stepping in and out. Especially as we get ummmm.... "older".

The sink in the lower right hand side of the photo is a temporary one. (And yes - it's the one I also scooped for free at the Reuse Center.)   It's useful right now for when Rob is washing paint brushes etc., but it's almost time to put the permanent bathroom sink and counter top in, and then I believe, this one will go up in my studio.


As we began to clean up the house in preparation for people's arrival, Rob decided to give the main floor another treatment. We really weren't happy with the dull finish, and opted to try yet another product.  This one came out much better, although we can still see some streaking. We suspect that the wonderful amount of light that streams in through the windows makes us more aware of the streaking, as it doesn't seem as bad in areas that have less natural light pouring in.


One problem we did run into this summer though, was the issue of high humidity. Although I love a hot humid summer, there were a number of days when that heat and humidity made it so that almost nothing got done.  The floor finish wouldn't dry, nor would the drywall compound.  We set up fans in the hope that some extra air movement would help, but the humidity level in the house remained fairly high (we could actually run a dehumidifier since we have excess power in the summer). After such a long cold winter, neither one of us wanted to complain about it being too hot or too humid.  And I'm happy to say that I changed into a bathing suit and headed to the river to cool off more times this summer than I ever remember doing in previous summers.

We also found that the high humidity was also taking it's toll on our items in the storage shed, so whenever we had a chance we would pick up a few boxes and try to sort things out. We had done all of our boxes of books and most of our clothing earlier in the year.  We were pleased to find that most of the remaining items were fine, although some items such as my sewing fabrics didn't fare very well, and had to be thrown out. While we were going through the boxes, we managed to pull out a few items that we knew for certain were no longer required, and get them into a "to be donated" box. We also pulled out some kitchen items, as we thought it would be nice to have some real dishes and cutlery when people arrived in late August.  We've been living here in the cabin with pretty minimal kitchen ware!

Once the boxes of items were cleaned and sorted, we tucked them away in the upstairs of the new house. It felt a bit strange to be moving them in, long before we will actually move in ourselves. But we were happy to have them somewhere clean and dry.


With a luncheon for 10 planned, as well as a couple of lunches and dinners for our "house guests", we set to installing a temporary counter and cupboard in the kitchen.


We finished tidying up the house a bit more, stocked the fridge up with a few items, and the house was ready! We planned on cooking almost everything in the cabin, and then bringing it over to the new house. I must say that it made for a bit of running back and forth, but it worked perfectly.

It was wonderful for me to be able to spend some time with Rob's brothers Kit and Ryan, and Ryan's lovely partner Michelle.  It's been a while since I've seen my "in-laws" in person (thank goodness for Skype at least!) as in the last few years I have stayed behind to look after the cats and dog whenever Rob would make the trip to visit them. It was their first time seeing the new house, and it was fun to show them around. We had a nice meal together on the Saturday night, and had some time to sit and chat. Rob and I headed home before bedtime with the dirty dishes as it was easier to wash them in the cabin, and sort out what we needed for the next day.  In the morning, Rob went over and whipped up breakfast and coffee while I stayed home to get the rest of the luncheon organized. Then some of Rob's cousins, their spouses, and a second cousin arrived for the day, (with more food!) and it was absolutely delightful to all spend some time together. Rob and his two brothers scattered some of their Mom's ashes at the river, while the rest of us toasted her with a champagne tribute and then we headed to the house for lunch. Although we spread ourselves around the house during the lunch, for some reason we all ended up sitting in the overhang porch outside the workshop for the remainder of the afternoon!  It seemed to be the agreed upon gathering place. There, we reminisced about Rob's Mom, and the times we used to all get together with her and the other members of her family. We really wanted our time together to be a celebration and I think we all did a grand job of it. But every one one of us felt the absence of  Mom's presence, and wished she was still here with us.

I was a little bit sorry that I didn't take a single photo at "Mom's party", but sometimes it just feels right for me to be totally present for the moment without the distraction of my camera, and this was one of those times.

Before we knew it, our time with family was over. We were just a little surprised to go out on our walk shortly after everyone's departure and find a large pile of bear scat on our road.  We had been assuring everyone all weekend that we hadn't seen any signs of a bear in the area this year!

Because the house was in reasonable shape for guests, we invited one more friend to come up in September for an overnight visit. Our dear friend Joe arrived and we spent an afternoon together enjoying a short hike up at the beautiful Shaw Woods.


We came home, had a great dinner in the new house, and had a good evening of catching up with each other.   I only wish I had taken a photo of the marvelous bed we put together for Joe in the guest bedroom, using a futon, scaffolding and scaffolding platforms.  (We put the same bed together for Rob's brother and sister in law in August and I forgot to take a photo then too!) It was truly "industrial style" and I actually quite liked the look of it.  But I've looked through all my photos, and can't find a single shot of it. We spent the following morning sitting by the river, and then enjoyed a lunch together before he had to head home. By this time, I was getting pretty good at planning and preparing meals in the cabin and bringing them down to the new house! Not to mention hauling all the dishes back and forth!

I must say that Rob and I are really looking forward to being able to spend more time here with friends and family in the near future.  This off-grid house building thing has been quite the project, and it will be nice when we are able to offer guests some food and a place to stay a little more easily.

We try to balance out our hours spent working on the house, with having some "down" time. But, as much as we enjoyed some of our socialising, it was time to get back at it. We really are hoping to move in this year, and there are a lot of things that need to be done before we can do so.

Although we don't have much in the way of furniture, we did have a couple of items that we wanted to get out of storage before winter set in, both of them rather heavy and bulky to move.  After some debate we decided which of the upstairs studios they would go in. It was an interesting discussion as Rob tends to like having lots of storage, and I tend to like having lots of open space! After we had worked out a floor plan that would suit us both, we cleared out my studio area first to make room for the drafting table. While the space was empty, Rob decided to redo the wood floor.  It hadn't come out entirely to our liking, and we figured now was the time to fix it, so he re-sanded it and applied another few coats of finish.  This time it came out much smoother.   Don't worry when you look at the photo, there will be a cable railing to stop anyone from going over the edge!


We still had some finishing work on the walls in the second area to do before we piled too much more in there. I'm still not sure what to call this room. The studio/office/cat hang out room ? Regardless, we got it all mudded, sanded,  primed and painted.   Then we managed to move in the flat files, and pretty much left everything else in there in a heap. It will take a while to sort out this space, and see exactly what we use it for, and what it will require. It's such a beautiful room and I can't wait to get all the boxes out of there!


Although we did find some fun old memorabilia in some of the boxes. Like this little gem from Rob's days long, long ago when he managed a music store.


And Jet just had to check out his "baby" harness when we came across it and pulled it out.



September was a rather lovely month, but as the light began to change, and the nights started to get cooler, we found ourselves with a pretty long "to-do" list, and a lot of that list had to be completed before the snow arrived.

It was time to deal with our propane heater in the workshop and our "new" propane tanks needed to be moved to a permanent location. We had poured a concrete pad for two smaller tanks originally, but when we decided to go with bigger tanks, realized the pad  wasn't quite big enough. Rob had to mix up some concrete and extend the pad.  Then we arranged for the propane company to come in and complete the installation of the larger tanks.

One item that has been on our minds since the spring, was the tandem load of oak wood that was waiting to be chain sawed into shorter lengths, then split and stacked.  Summer isn't a good time for that kind of job, both because of the heat, and the mosquitoes and black flies. Even in early September some of the days were simply too warm, although the insect population had declined.  It's a quicker and easier job to do with two people, and a horrible job to do if it's raining (or snowing!). So on days when I wasn't working and the weather was decent, we began to grab a few hours here and there when we could, and started in on the pile. This wood is for future years, but it needs time to dry, especially as we will need some of it to be dry for next fall.




I learned to keep my back to the wood that needed splitting, so that I wouldn't dwell on how much had to be done, and instead looked at the growing pile of split and stacked wood to keep my spirits up.  Slowly and surely the split wood started to stack up!


We actually both enjoy the process, and it was fun to work together, taking breaks every now and then and watching the birds flocking in the nearby cornfields.


Judging by the number of corn cobs we keep finding on our road, there are some other animals feeding on the corn, and after finding some rather substantial piles of corn infused scat, we started putting our trail cam up to see what was in the area. Sure enough, in early November one night we caught film footage of not one, but two bears coming from the corn field direction. Yikes!

It took a bit of work, and just when it seemed we'd never get the fire wood done this fall, the pile suddenly diminished, and it was pretty much finished.


At the end of the day we were both ready to head down into the river, and enjoy some cool refreshments. And as long as the warmer weather lingered in September (and even on a few days in early October!) we made sure to grab any opportunity we could to spend a bit more time in the river, or at the river's edge at the end of a long day.





On the days when we weren't splitting wood, our chores varied between working on the new house, and taking care of pre-winter tasks here at the cabin.  We began with acid staining the floor of the master bedroom in the new house.




While the concrete floor was drying, we worked at repairing the trailer wiring harness that was installed on our truck (after discovering some odd flashing lights on our dashboard we finally figured out that it was due to the failing wiring harness!)


And then we did the servicing for the snow blower, and the tractor. With a little help from some manuals!



When our guests were here in August, we discovered a few glitches in our guest bathroom shower stall, so we also had to take a look at that design and fix a few areas there too. It appears that it is now all under control.

This is the time of year when I begin to sigh a lot.  Rob is used to it, and points out that I do it every year as summer comes to an end, and fall arrives.  I love all the seasons, but I guess summer is my favourite, and as the weather changes, and the evening sunset arrives earlier and earlier - well - I sigh a lot.

I do enjoy the soft light, the fog in the morning, and the colours of the leaves.





Still.... I sigh....

And then we get back to working on the house.  Which meant going back to a job we began way before summer began.  The job of installing more window frames!  After much debate whether to use Oak, Maple, Cherry or Ash,  we settled on Ash wood for the master bedroom frames.  We seem to have a bit of a collection of nice wood, collected over the years, (rather a lot of years actually) and it's time to use some of it up.  I like the grain and colour of the Ash, but then I pretty much liked any of our choices.



Maple was the choice for the guest bathroom window frame.


In the past, at this point in the blog, I would usually make sure that I included a photo of Rob and I doing something other than working on the house, so that Rob's Mom would know when she read it, that we also went out in the Fall and had some fun! So in her honour, here is how we spent Rob's birthday this year; a somewhat annual tradition of going for a walk in the beautiful Shaw Woods.


And we continued to head over to the point, to sit and relax and listen to the river at the end of the day, whenever we could.


In late October we tackled the finishing of the drywall in the master bedroom, a room that Rob assured me would be "no big deal" to do.  But of course, it was still a lot of work; with lots of corners and angles and closets to do.  In the past I believe we would have left the closets unfinished, but we are trying to finish everything that we can before we move in. We know from experience that unfinished drywall in a closet remains unfinished after you've piled all your clothes in it!



Mother Nature has a way of reminding you of the next season to come, so when it started snowing (really - in October ?) we rushed to finish off last minute outside jobs as soon as it melted.  Pulling out those turquoise chairs and tucking them away was really hard for me.  It's our favourite place to sit at the end of the day, and it was hard for me to admit that those days are over.  I left the wood bench though....just in case.




And then we continued working on the bedroom; mudding and sanding, and getting the hallway and mudroom in shape as well.


I couldn't wait to see the bedroom painted, as I was still not convinced that I really liked the colour we chose, but although it's not a colour we would usually use, I love it.  It has the right amount of lightness in the day, and warmth at night.  And I think it shows off the beautiful wood beams perfectly.





The mudroom and hallway are the last two areas in the house that need to be painted. Already Rob is working at night on the next big project which will be the cabinetry.

We've moved the melamine board into the house in preparation.  And I use the term "we" but I actually made sure I was working the day that these were moved into the house.  Each sheet had to be moved out of storage, cut in half, then moved into the house. And they are heavy and awkward to move.


We will make all of our own kitchen cabinets and bathroom cabinets, so we are now just figuring out all the hardware we'll need (hinges, drawer slides etc.) and finalising the kitchen cabinet design. The doors will be made out of wood, but we are considering painting some if not all of the doors.  On the advice of the local paint shop owner, we tossed our potential colours on the floor and then began the process of elimination. We eventually narrowed our choices down to two, which isn't bad.


We are still debating what to use for the back splash behind the stove.  We have found some tile that we like (at a price that we like!) and some tile that we really like (at a price that we really don't like!)  But then we found some rather cool squares made of metal behind an old shed on our property, and are considering sprucing them up, and using them instead.  I guess we'll see how that goes, but for now we will concentrate on the kitchen cabinets. The back splash may become a bit of a future project.

And that is where we are right now.  We are still hoping to move in before the end of this year.  Of course, in reality we could almost move in any time, but we have a lot of experience with living in unfinished spaces and know that we need just a few more areas to be finished first.  It is much better to allow Rob the time and space to plan and install the kitchen in particular, at least to a point that it is entirely usable. As well, we need to get those railings up, and the permanent staircase in too.  And there are a few logistics still to work out; things like telephone and internet. (Just to name two!) We sure are getting close though.  Maybe a little too close, as I pepper Rob with questions every morning until he makes motions that his head is exploding.  Obviously, there's still plenty to think about, and lots left to do. This is my 74th posting on this blog though, and it's hard to imagine that it may be the last one I write from here in the cabin, and that the next time I write we might actually be in the new house.  If not, that's fine too. I think we are both feeling that at some point soon however, we'll be walking down that road, and into our next adventure.








Sunday, 7 January 2018

Farewell to 2017

I think that if I decide to make any New Year's Resolutions for 2018, the top one on my list should be to keep the blog updated a bit more often!  The last post was in August, so the task of looking back over the past four months worth of photos and diary entries and then trying to write something just doesn't work all that well for me, and I obviously should have kept up with it better. That said, I'll do my best to put a little something together although it may seem to be a bit of a choppy read at times.

Recent temperatures have been around minus 33 degrees C, and with the biting cold and a thick blanket of snow on the ground from the December snow storms, I must say it's quite lovely to be looking back to photos I took in August and and to remember a time when it was warmer, with a land covered in greenery. Funny too, to think that back then I complained that it was an unusually cool summer!

The end of August saw us getting ready for the concrete pour at the entrance of the workshop:


And a small porch area at the front entrance of the new house:



Rob prepared both areas, and then decided to prepare an extra pad next to the workshop as well; one that would serve to hold our propane tanks, in case there was enough concrete left over to do so.

Alas, due to a slight miscalculation, there was quite a bit of concrete left over! On the plus side, we definitely had enough for the propane tank "pad" but there was still had an awful lot of concrete leftover. Unfortunately, concrete trucks hate waiting while you try to build something to contain the excess, so with only minutes to decide what to do, he hastily plopped down some 6x6 timbers and had them pour a quick pad next to an existing one elsewhere on the property.  And this is where it will sit, possibly forever, as a constant reminder that when calculating cubic yards, 3x3x3 feet does not equal nine. Another useful fact is that concrete flows downhill as evidenced by the wonky corner. Again, on the plus side, the slab has excellent drainage. I'm thinking maybe we could build a little goat shed on it in future. Goats won't mind that it isn't perfect will they? Or maybe it will work for a small pony! (More likely though it will end up as a base for a wood shed. Still, it was fun to dream.)


As soon as we got over the "concrete thing" (note from Rob: I'm not over it yet!) we moved on and got back to work.  It was time to finish the back roof on the workshop, as we had run out of time the previous fall and didn't want it to go another winter without the roofing and ridge cover.  I don't think Rob was eager to get at it, but if it's any consolation, we think it may be the last roof he has to do (not true of course - see later in blog)!



I think it came out looking pretty good, and it was a relief to see it get done this year.


The September long weekend was rainy and cool and probably not a surprising ending to the "summer that wasn't".  With morning temperatures of only 3 degrees, and imminent frost warnings, we decided we'd better service the tractor and generator while the weather was still reasonable, as neither are tasks you want to do when it's cold or snowing!

With some of the outdoor tasks done, Rob got back to constructing the interior window frames.  Our bathroom frame was made of lovely cherry wood, and is truly beautiful, but it certainly was a bit of a job getting it installed behind the timber brace (it looked so easy in the drawings)!


Next came  the kitchen window frame. It has a sweet accent line of maple on the sill - which, as it turns out, is due to another mistake Rob made, but no one will ever know that (Rob's note: until now!) I think it looks perfect (he shouldn't have told me as I would never have guessed).


As always in September, we began to feel a bit of pressure due to the change of seasons. Rob was anxious to get at acid staining the concrete floors while it was still warm enough inside the house. He was going to have to move out the wood stove, so there would be no source of heat while he was doing the floors.  We had to clear all of the floors of building supplies and stuff, and move everything into our bedroom (which will have it's floor done later) and started doing some test areas on the concrete.


We did our tests in the guest bathroom, as this floor has to be tiled anyway because of the shower, so our test areas will be nicely covered up.  But before doing these, we placed a few of the floor tiles down just to confirm that we liked the choice of tile we'd made - and we did. We picked tiles that look like weathered wood with a bit of old blue paint on them and I love them.  It's a small bathroom, so we could splurge a bit on a nice tile, and Rob had picked them up earlier last year.


The first week of September saw a whole new project enter into the scheme of things. Our friend Bob who has always come to help when we needed a second pair of hands, had asked Rob to help teach him how to build a timber frame structure.  He wanted to build a small one on his own property to use for wood storage.   Rob was more than happy to oblige, as it would be a small way to thank Bob for all his effort and help.  So a deal was made to help Bob on the days that the weather was good, and on the rainy days Rob could continue working on the interior of our house. The timbers were brought to our place as we had all the tools here that would be needed, as well as a perfect setup for working on them.

Amazingly, in mid September our summer suddenly arrived! We had big beautiful blue skies, endless sunshine, and warm temperatures. It was great to be able to work comfortably outside wearing T-shirts although the mosquitoes and no-see-ums were back out in full force too, which seemed strange given the time of year.






If I had a day off work and they were busy working on the timbers, I would help prepare something for our lunch together.  Sometimes Bob would bring a nice homemade soup for us, and I was delighted when Rob set me up in the new house with a bit of work space and a hot plate, and I "cooked" our first lunch there.  Although I was technically cooking in what will eventually be my sink area, it was a total joy to be in our light filled space, window open, looking outside at the lovely river, and imagining the times to come. When the guys showed up for lunch I couldn't help grinning and exclaiming "I'm cooking lunch in my new house!".


Once they finished with the timber preparations, we moved them all over to Bob's place, where he could finish up some of  the remaining work on his own, such as making the braces.  When he was ready, Rob would go back and help with getting the frame up.


The September weather was incredible, and for the first time all year we found ourselves spending time in the evenings relaxing down at the river's edge, and we even went in for a swim a couple of times!


Some evenings, as we sat in our favourite place at a point above the river, we would see the Osprey fly by.  A short time later we would hear the telltale splash as it hit the river, in search of a fish for dinner.  I still haven't actually watched one do that, but I hope to someday.


As the end of September approached we knew that these warm summer-like days were about to end so we made the most of them.  I would rush home from work each day to grab a bit of that warmth and sunshine while I could. The birds were beginning to migrate, and we knew this weather couldn't last. But with promises of the weather holding for a little while longer, we decided to make a trip out and pick up some timbers for our entrance ways, as it seemed like we might have time to get them ready and installed.

During the first week of October, Rob and Bob got Bob's frame up. Well, it took two tries, as they discovered a few adjustments that needed to be made!.  But they didn't lose too much time, and Bob hoped he would still have enough time to get his roof up and on before the snow arrived.

We were glad we could do a little something in return for Bob's efforts, but now it was time to get back at our own project again.  Rob began cleaning our concrete floors in preparation for the acid stain.



He also had a design in mind for the baseboards, and needed to cut the drywall off a bit where it met the floor.


He taped cardboard between the floor and the drywall before applying the stain, so the drywall wouldn't get sprayed (it did anyway!) and then sprayed 2 coats of the acid stain on using a standard pressurized hand sprayer.  After the stain dried he had to neutralize, wash and scrub off the residue, using the shop vac to remove any excess water.



We loved the way it turned out, but knew it might change a bit after we put on a finishing coat to protect the concrete surface.   This is how the guest room looked before the protective coating:


A view of the kitchen while the acid stain was drying:



 The front entrance:

The kitchen and dining room:


I loved the turquoise colour running through the kitchen!

So the colours worked great but when we put the finishing coat on - ugghhhh.... it was too shiny! It was supposed to be a matte finish and it just didn't come out that way at all. It was also really "patchy" looking, with varying glossiness and although we loved the depth of colour, it just wasn't what we wanted.  Rob did some research and came up with a new product to try that was guaranteed to be "matte".


While we waited for delivery of the new floor finish, Rob's birthday arrived, and we took the afternoon to go for a glorious walk in the very beautiful Shaw Woods.



We've seen snow here on Rob's birthday in the past, so we really appreciated how lovely it was to be out in the woods enjoying warm weather and brilliant sunshine, with all the truly golden colours of fall all around us.

It was also great to have a visit from our wonderful friend Marilyn just before Rob's birthday - no photos (unfortunately) but a perfect day. Several years ago Marilyn gave Rob a ceramic geodesic bird house that has graced our driveway ever since we started building. At least she got to see it - a few days after her visit a branch came down in a windstorm and destroyed it. It must have been waiting to see her before leaving!

With November fast approaching, we still had more than a few tasks that needed completing before the weather changed. Rob was still hoping to get the exterior timber structures up in the porch areas where we had poured the concrete, so each day he would work putting a layer of the new finish on the floor, then while it was drying he'd go up and work on the timbers.



He first had to sand down the glossy finish on all the floors,  and then applied the new product. We lost a bit of the depth of colour in the process, but we were both really happy with the results.


As soon as the timbers were ready, Rob moved them down to the new house, and was even able to get a protective coating of Cetol on them.

The weather was beginning to change and I started pulling out the garden, gathering wood and kindling to store on the porch, moving my summer clothing out and back into storage, bringing winter clothing in, and getting the cabin sorted out.

We moved the wood stove back into place in the new house, serviced the snow plow, and got the truck ready for winter.

We still had more than a few cords of firewood to split, so stopped everything else and took a couple of days to get it done together.  Then we had to move what we hoped would be enough of the dry split wood down closer to the cabin, and got it neatly stacked and covered.


We also took some over to the new house and stacked it under the shelter of the workshop roof.

Rob made one more trip over to our friend Bob's to help him get his roof on, although they had to wait until a snow squall passed before they could finish it. Bob is at a higher altitude than us, so often gets snow when we don't.

We didn't quite get our entrance way timbers up in time, as then it snowed here too. And got much colder!


It sure was pretty though.


Our long time friends, Gary and Liz decided to come up from Florida for a visit.  While we were really looking forward to seeing them, we couldn't help but wonder why anyone would leave Florida in November to come to Ontario!  We can only guess that they missed the snow and crisp cold air! Luckily we were able to provide them with plenty of both.

Rob decided to move a few things into the new house so that we could have a more comfortable visit with them, so moved in our fridge, dining table and chairs, two living room chairs and our stereo and speakers.  While we still couldn't offer them a comfortable place to stay, we could at least gather easily around the wood stove, and provide some snacks and such.  With a hot plate and a bit of planning, we even managed to provide a hot soup for lunch, and a simple dinner of veggie burgers and salad for a quick dinner!

Here I am (slightly blurry...) cooking our first dinner in the house!



And with our friends in our dining room:


We even managed to get out for a drive and showed them Bob's new (finished) timber frame.


After they left, it warmed up very slightly and Rob decided it was a good time to get the generator hook up installed while he had a chance. This will allow us to start up the generator and plug it into our off grid system if we need to charge the batteries, or simply run off of the generator at any point. He also decided to try to get the timber frame structure up under the roof overhang of the shop and new house front entrance.






We managed to get them up, but not totally installed, when it snowed again, and our temperatures plummeted. They will probably have to remain in this state until spring.



We always look forward to winter, and the changes it brings, but we always forget that it brings some new challenges with it.  The shorter hours of daylight result in Rob stopping early in the afternoon in order to get Jet out for one last walk before darkness falls. With an unusually cold December, we went through a lot more fire wood than normal, and it was a bit more effort to keep both the cabin and the new house warm.  When it warms up a bit we get snow, and then we spend a day plowing and clearing, which is how we spent Christmas Day!  Not to mention having to keep the solar panels clear of snow.


Still, it's nice in the winter to curl up in a warm house and have a game of scrabble with Jet but he was complaining that I used the "O" he wanted to use and put it on his triple letter space.   (O.k. - it might have been a staged photo as I was trying to get one of my PhotoCoach challenge entries completed - but I had fun doing it, and Jet's always willing to help out).



We also tried to take a bit of time to sit by the wood stove in the new house, while we still had the chairs and stereo there to enjoy.  It's nice to sit and listen to some of the many CD's we have that have been tucked away in storage all this time - not to mention enjoying the sound of real speakers! We've been listening to a limited number of CD's through a Walkman plugged into a docking station for far too long...

All this will end though, as we are about to move that little bit of furniture back out, so that Rob can begin the task of taping drywall, sanding, and painting. The house is about to go through some real changes!

He's spent the last week or so trying to get his workshop organized so that he has room to build the cabinets and things that will fill the new house.  Wisely, he decided not to rent a floor sander over Christmas to do the upper floors!  Instead, we curled up on Christmas Eve, with our little tree outside all lit up, and toasted each other with hopes that Christmas next year will truly be celebrated in the new house.



New Year's Eve came and went, with severe cold warnings, and bright blue skies.  We stayed pretty close to the wood stove for the most part, although I couldn't resist bundling up and going down to see the changes in the river.  This time last year the river was wide open, but this year there was a small narrow channel here and there, and for the most part it was mostly ice.  While there are lots of animal footprints along the edges, you won't see mine as I am pretty cautious not to get too close to the edge, which still changes almost daily.


And so, as 2018 begins, we continue to dream and plan and design the house interior, and look forward to the coming months as everything (hopefully) comes together. Our time here in the cabin has been sweet, and I know there are things I will surely miss, but at the same time I am looking forward to the change.  We are anxious to pull out our boxes of "stuff" to see what has survived, to rediscover some of the art work we have missed seeing on our walls, and to listen to more of the music we have missed all this time.


My mantra this year is simple, yet complex. It is "Community".  For while this project has gone on, it is something we have had in some ways, but not in others.  I hope that the finishing of this house will bring more community back into our lives somehow, whether through more frequent visits with friends, or the bringing together somehow of more like minded people.  I'm not sure yet where it will begin, but I know this word is for me this year, so I will remember it, sing it, chant it, and see what happens.

Wishing all the very best for 2018, and peace, love and joy to all.